Abstract

A CSA Subcommittee has produced a draft proposal for a revision of the part of Standard C22.3 No.1 on Overhead Systems that is focussed on 230 kV and Above. The recommended procedures introduce probability based techniques in an effort to incorporate the major dispersions that can influence the risk of failure of transmission lines; The climatic loads are selected on a Return Period Storm basis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.