Abstract

Probabilistic transmission planning has become increasingly necessary and important in recent years. Some utilities like British Columbia Transmission Corporation (BCTC) have started their practice toward this direction. This article addresses basic aspects of probabilistic transmission planning. The probabilistic method is not intended to replace the deterministic criterion but adds one more dimension to enhance the transmission planning process. An actual example at BCTC is provided to demonstrate the application of probabilistic transmission planning.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.