Abstract

This paper presents the application of probabilistic methods for the seismic analysis of existing industrial facilities. First, the main advantages and the rationale for probabilistic (versus deterministic) approaches are discussed for existing structures/facilities. A short overview of existing probabilistic and deterministic seismic analysis approaches follows. Afterwards a simple and efficient probabilistic approach is presented with an example as application on existing industrial facilities. The method involves state-of-the-art probabilistic seismic hazard analysis (PSHA). It covers the whole industrial facility including structures, components, mechanical installations, piping, tanks, etc. In comparison to Monte Carlo Simulation, this method is cost-effective and practical and can be used for risk-informed/performance-based rehabilitation or strengthening.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.