Abstract
This paper suggests a probabilistic method for the calculation of operation cost throughout a planning period and availability evaluation of substation components, in connection with planned maintenance activities. This method is conceived to provide lower operation cost, consisting of failure repair cost and maintenance cost, and higher availability of substation components. The method identifies minor and major failures. It is assumed that each component has two independent, competing failure modes: wear-out failure mode, modelled by a two-parameter Weibull distribution, and a chance failure mode, characterized by an exponential distribution. The application of the method suggested is demonstrated for a 145 kV air-blast circuit-breaker. By applying the method, influence of condition monitoring systems application on operation cost is evaluated. Also, because of comparison, expected operation cost in case of time-based maintenance performing is calculated.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.