Abstract

The paper suggests a method to optimize the spare amount of power transformer components. The proposed strategy is conceived to provide minimum annual cost consisting of expected failures renewal cost, capital cost for spares and load curtailment cost. The method identifies minor and major failures. Minor failures are repairable, while major failures can be repairable or unrepairable. Power transformer is a complex system, consisting of six components (functional parts). It is assumed that each component has two independent, competing failure modes: wear-out failure mode, modelled by two-parameter Weibull distribution, and a chance failure mode, characterized by an exponential distribution. The application of the method suggested and the benefits it provides are demonstrated for one transformer station (TS) 110/ x kV/kV with 2 × 31.5 MVA transformers. In addition, the influence of performing power transformer refurbishment on expected total cost has also been analyzed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.