Abstract

The infrastructure for small irrigation systems demands costly investment which may become increased as many social and technical aspects related to the concerns of regions susceptible to investment remain unknown. The lack of both information and a social network supporting planning and design tasks constitute factors affecting many irrigation projects, consigning them to failure. Some indicators were prepared for constructing an irrigation system in the north of the Cauca department in Colombia which, in turn, led to determining investment priorities and facilitated decision-making. The indicators guaranteed that the construction would benefit the greatest number of users, assuring wider irrigation coverage. The project lasted forty-two months; the basic irrigation system was designed and constructed during this time, alternating direct reception via surface water sources and digging wells to use groundwater. Investment costs were lower than estimated FAO reference ones.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.