Abstract
The purpose of this study is to provide the priority of the front-loading factors in the design stage of the automotive parts development process in order to efficiently and effectively respond to the demands of the car maker (customer). Front-loading is defined as a strategy in order to improve development performance by shifting the identification and solving of design problems to earlier phases of a product development process. Two approaches of the front-loading are project-to-project knowledge transfer and rapid problem solving. For the study, a survey was conducted on the R&D department in the automobile parts company and analyzed by AHP (Analytic Hierarchy Process) method. The result of the survey shows the cost savings is the highest weight in terms of front-loading effect and in terms of front-loading factors, it gives priorities as “the problems of past project” first, “Design Review” second, “CAE (Computer Aided Engineering)” third, “FMEA (Failure Mode and Effects Analysis)” fourth, “benchmarking” and SR (Sourcing of Requirements). The results of the study will be helpful to provide practical value for improving product design of component development.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Society of Korea Industrial and Systems Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.