Abstract

Aim: To conduct cause-effect analysis of identified risks, ranking and prioritization according to general risk assessment methodology to ensure proper execution of biowaiver procedure in compliance with necessary requirements for its reproduction. Methods: Was used method of cause-effect analysis with construction of Ishikawa diagram. Prioritization of risks was performed with help of expert evaluation.Results: Performed analysis allowed to identify the most influential risk factors, negative effect of which can cause significant consequences during conduction of bioequivalence studies of generic drug and reference drug based on biowaiver procedure.Conclusions: Identified and justified priorities among identified risks are carriers of primary causes of potential risk of problem arising in ensuring the quality of conduction of biowaiver procedure. Further studies should be linked to a more profound analysis and risk assessment with regard to their potential threat and probability and formulation of proposals for preventive actions to ensure compliance with established requirements of biowaiver procedure

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.