Abstract

Finite element software was employed to establish a model to simulate the compound soil nailing. The model simulates the process of constructing prestressed compound soil nailing. Compared the condition prestressed with no prestress, analyzed the Impact of prestress anchor on the deformation in the process of construction and the effect on axial force of soil nail. Applying prestress is able to control the horizontal displacement obviously, but has not obvious effect on vertical displacement, especially place the anchor bolt at the lower part of the slope. In the process of construction, prestress has an advance effect on the deformation of foundation pit and the axial force of soil nails near the anchor bolt.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call