Abstract

Summary This paper presents a new method of estimating a constant-rate analog for a variable-rate flow period followed by a pressure-buildup test. The time and rate in the analog are used to generate a conventional Horner plot for the buildup test. The approximation is derived rigorously from the Horner buildup and variable-rate superposition equations. The major advantage of this method over other proposals is that it not only forces the production volumes to be equal (material-balance constraint) but also forces the pressures at a particular time to be equal. Our approximate method has been verified for several variable-rate schemes with a finite-difference numerical simulator. The effect of wellbore storage was studied at both surface and sandface rates. The effects of a short shut-in time and a shut-in time equal to the duration of the production period were also investigated. The results of the new method seldom varied more than 5% from the results obtained with rigorous superposition. The new method is not intended to replace superposition, but rather to give the best possible constant-rate analog. This method enhances our ability to use the conventional (constant-rate) Horner theory to generate accurate results. Also, our new method requires a single superposition calculation rather than a superposition calculation for each data point, as in the case of the superposition plot.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.