Abstract

BIM technology is widely used in today’s construction industry. Compared with the construction industry, China lacks in-depth research on BIM’s application to water conservancy sectors and there are many problems. Based on the application of BIM in the water industry, this study introduces the TOE framework to focus on the non-value-added activities in the use of BIM, and analyzes the non-value-added activities in the application and promotion of BIM in the water industry that affect the priority allocation of resources and other issues, and finds that the technical aspect is the biggest problem in the promotion of BIM.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.