Abstract
In-service Inspection (ISI) schedule program for nuclear island equipment was of the important part of ISI program file system in nuclear power plants (NPPs), which acted as a connecting link. Based on ISI rules for the mechanical components of PWR nuclear islands (RSE-M) and the plant ISI general program, the preparation method for schedule program of CPR1000 units were presented. It focused on the analysis and discussion of the existing problems during the preparation, upgrade and management process and some targeted suggestions were put forward. It may lay a foundation for a further optimization of the ISI program file system and the smooth implementation of the ISI activities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.