Abstract

The preliminary-preparations period in hydropower construction should include a complex of first-priority operations for setting up the construction site. The items to be constructed during this period include entry bases and access and site roads; power-, water-, and heating-supply items; storehouses, repair shops concrete production plants of small capacity, etc.; and dwellings to accommodate 200 to 400 men per site. The preparations period in hydropower construction, as regards deadlines and schedules for the items to be constructed, should be determined by the design and construction organization, individually for each item, taking into account the local geographic and production-engineering conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.