Abstract

AbstractThe traditional quality control method of the whole construction process is lack of process quality evaluation, which leads to the low overall quality score of the project after the completion of the project construction. A whole process quality control method of water conservancy and hydropower construction based on BP neural network is designed. First, set up water conservancy and hydropower construction site monitoring, and design data acquisition equipment for the whole construction process according to different construction positions; According to the acquisition equipment set above, collect the water conservancy and hydropower construction data at different locations and use them as the control data; On this basis, the framework structure of BP neural network is established, the control network level is determined, the back propagation function is determined, and the collected data of the whole process of water conservancy and hydropower construction are trained to complete the whole process quality control of water conservancy and hydropower construction. The example analysis results show that the whole process quality control of the project using the design method can effectively improve the construction quality.KeywordsBP neural networkWater conservancy and hydropower projectsWhole process quality controlData acquisition

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call