Abstract
The US Department of Energy (DOE) Electric and Hybrid Vehicle Program is involved in the development and evaluation of sodium-sulfur energy storage batteries for electric vehicle (EV) applications. Laboratory testing of complete battery systems, to be followed by controlled in-vehicle testing and on-road usage, are expected to occur as components of the DOE program during the 1988--1990 time frame. Testing and operation of sodium-sulfur batteries at other DOE contractor facilities may also take place during this time frame. A number of regulatory and safety issues can affect the technical scope, schedule, and cost of the expected programmatic activities. This document describes these issues and requirements, provides a preliminary evaluation of their significance, and lists those critical items that may result from them. The actions needed to permit the conduct of a successful program at DOE contractor facilities are identified, and concerns that could affect the eventual commercialization potential of sodium-sulfur batteries are noted to the extent they are known.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.