Abstract

Forecasting construction project duration for future with accurate efficiency by considering all the delay factors is a big deal. Various examinations have been done to evaluate the reasons for duration delays in a construction site. Most common similarity between many factors are flawed design, inadequate supervision in workplace, shortage of supplies, absence of teamwork and local climatic conditions, causes a myriad of issues. Here, for forecasting, we chose the construction of ROB project at Kurnool, Andhra Pradesh. Though many techniques have been implemented to solve out this problem, predicting completion of an ongoing project is a big deal. Various tools have been used such as earned value management, exponential smoothing technique. After applying these techniques, a comparison with a minimal percentage of error is made and the best tool for prediction is selected. This investigation prescribes Smoothing techniques, the results become better when compared with different procedures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.