Abstract

Adjustment wells need to be deployed in the middle and late stages of oilfield development to improve development efficiency. However, the multiple pressure systems would be happened in the fault block oilfields due to the geological faults are developed and multi-layer joint water injection. The well kick and leakage would happen during drilling and completion operations of adjustment well because of the large dynamic pressure changes such as high-pressure or low-pressure. A pressure prediction method established base on seepage theory and fluid mechanics theory in order to ensure the safety operations during the adjustment well drilling and completion. This method could predict the maximum formation pressure of adjustment wells in complex fault block reservoirs by considering the influence of faults and surrounding injection-production wells. The error between prediction results and numerical simulation results is less than 10% based on Bohai fault block oilfield. The scheme of shut-in of surrounding water injection wells during drilling and completion of adjustment wells in fault block oilfield is given. This method has significance guidance for the design of shut in adjustment well drilling and completion.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.