Abstract
The number of construction megaprojects, with costs exceeding RMB50 billion (nearly USD800 million), has increased exponentially in China in the past two decades because of outstanding economic achievements and fast urbanization. However, these projects are usually beset with underperformance problems, such as cost overruns, safety incidents, functional and quality defects, and poor environmental and sustainable performance. Programme management has been increasingly advocated as a pragmatic approach through the centralized coordinated management to improve megaproject performance at the overall organizational level. This paper reports a pragmatic framework of programme organizational capability comprising 24 factors based on a case study of the Shanghai Expo construction. The 24 programme organizational factors (POFs) identified from the literature review and interviews are grouped into three categories in terms of organizational capability theory, organizational contextual capability, organizational cor...
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have