Abstract

Summary Effective phasor measurement unit (PMU) placement is a key to the implementation of efficient and economically feasible wide area measurement systems in modern power systems. This paper proposes a pragmatic approach for cost-effective stage-wise deployment of PMUs while considering realistic constraints. Inspired from a real world experience, the proposed approach optimally allocates PMU placement in a stage-wise manner. The proposed approach also considers large-scale wind integration for effective grid state monitoring of wind generation dynamics. The proposed approach is implemented on the Danish power system projected for the year 2040. Furthermore, practical experience learnt from an optimal PMU placement project aimed at PMU placement in the Danish power system is presented, which is expected to provide insight of practical challenges at ground level that could be considered by PMU placement software developers as well as for future research in this field. Copyright © 2016 John Wiley & Sons, Ltd.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call