Abstract

To ensure the mechanical safety “base + foundation + building” system can control all its components. One of these techniques is to design the control device and artificially improved grounds with the required mechanical properties. This problem is perspective in those cases where the base building condition is very poor, and the payment of their impact modification of other components of the system is impractical or economically inefficient. This approach has been implemented by “New Ground” on more than 300 construction sites in the Perm region, Moscow, St. Petersburg, Krasnodar, Samara, Ufa, Tyumen, Kazan. Geotechnical monitoring of construction projects carried out jointly with specialists of the Perm National Research Polytechnic University, Institute of Continuum Mechanics and Mining Institute (Ural Branch of the Russian Academy of Sciences). Practical experience in this kind of artificial bases proposed for discussion in the framework of the proposed report.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call