Abstract

The development of the construction industry is considered to be a significant factor contributing to the economic growth of states and countries. However, many studies have shown that the quality of time and schedule management on civil and construction projects has generally been poor. Thus, it is essential to investigate factors that significantly affect the project schedule. This research aims to examine the practice of time management on a particular construction transport project in a developing country, the urban railway project in Ho Chi Minh City, Vietnam, with its six main lines. The implementation of this project began in 2010, but so far, only two lines have been constructed. The implementation process has been struck by many difficulties leading to the slow implementation of the entire urban railway system. To investigate the main causes leading to project delays, a research survey was carried out in three main stages: (1) a questionnaire was designed (2) data was collected with the participation of experts, and (3) an analysis of the data verification of the research model. Then, the analytical hierarchy process approach was applied to assess the priority level of the proposed solutions to ensure the effectiveness of the schedule of the entire urban railway project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.