Abstract
In this article, we propose a novel solution to address the current challenges related to charging an Electric Vehicle (EV). The Power on the Go: Single-drop and Double-drop problems allow an EV to be charged at a convenient location, where a service vehicle (drone), which is launched from a nearby charging station, can bring a compatible power bank at the request of the driver through an app. The objective is to reduce the cumulative wait time between service requests and the start of charging. We present mathematical formulations and two order-first split-second-based heuristic approaches for both problems. While the mathematical formulations can generate optimal solutions for small instances in a reasonable amount of time, the heuristics are fast and perform very well, with gaps < 5% for up to 20 node instances. Moreover, the formulations highlight the mean savings in wait time (29.37%) when the power bank can charge two EVs consecutively before a replacement is needed. The implications of the proposed model can be extensive, as we seek to overcome the availability and technological challenges of EV charging while advocating its adoption.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.