Abstract

The verification of power grids in modern integrated circuits must start early in the design process when adjustments can be most easily incorporated. This work describes a vectorless verification technique that deals with circuit uncertainty in the framework of current constraints. In such a framework, grid verification becomes a question of computing the worst-case voltage drops which, in turn, entails the solution of as many linear programs (LPs) as there are nodes. First, we extend grid verification to also check for the worst-case branch currents. We show that this would require as many LPs as there are branches. Second, we propose a starkly different approach to reduce the number of LPs in the verification problem. We achieve this by examining dominance relations among node voltage drops and among branch currents. This allows us to replace a group of LPs by one conservative and tight LP. Results show a dramatic reduction in the number of LPs thus making vectorless grid verification in the framework of current constraints practical and scalable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.