Abstract
The problem of the data acquisition/control system topology for distributed control systems in big power plants and/or power distribution centres is usually solved in a rather arbitrary way. The paper presents some reasonable approached based of evaluation of the system robustness, using the μ function as the measure or robustness. The paper proposes a method feasible for actual system designers since computational effort is rather low for communication systems described with time-delay members only.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.