Abstract

This paper presents the results of an initial assessment of potential wind power generation dynamic impacts on utility systems from a global utility perspective performed for the Electric Power Research Institute. Dynamic study of minute-to-minute ramping, frequency excursions, and short-term transient stability was performed using the isolated Hawaiian Electric Company (HECO) system as an illustrative example. Potential minute-to-minute ramping requirements imposed on conventional generation units of two interconnected utilities, Kansas Gas and Electric (KG&E) and Public Service Company of Colorado (PSCo) were investigated, using interconnected utility operating criteria.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call