Abstract
Energy recovery within processes via heat exchanger network (HEN) to minimise the external utilities has been well established. Due to the close energy interactions between HEN and the utility system, it is important to synthesise these two elements simultaneously. In this work, a novel systematic approach for synthesis of HEN with utility systems is presented. Multiple cascades automated targeting is applied to determine minimum total operating cost of the trigeneration system, minimum hot and cold utility targets for heat integration prior to detailed design. Besides, the selection and allocation of utilities, distribution of steam, and potential power generation can also be determined. Meanwhile, the types of boiler fuel for the trigeneration utility system is also identified. An illustrative example with two scenarios is solved to illustrate the proposed approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.