Abstract

LEED certification of structures is desired by many public and private owners for a variety of reasons. Pursuit of a LEED rating is commonly incorporated into design or construction at the earliest possible opportunity, as the certification process is significantly affected by owner motivation, project goals, and construction constraints. Is it possible to take a building not designed to LEED specifications and modify it as part of the construction process to obtain LEED certification? This article explores LEED certification after initial design has been completed with regard to issues the contractor can influence. LEED certification managed by the contractor appears possible for many commercial and residential structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.