Abstract
Induced trench construction is commonly used to reduce earth pressures on rigid circular and box culverts. Most of the reported literature pertains to the performance of induced trench culverts during construction and shortly after construction. This paper addresses the post-construction performance of induced trench culverts. First, results of field inspection reports are presented as an indirect assessment of performance of 90 induced trench culverts installed in New Brunswick that have been in service for up to 24 years. Second, earth pressure measurements are presented from three case studies where prototype installations were monitored over periods ranging from 4 to 9 years. The case studies presented include a single circular culvert, a cast-in-place double-cell box culvert, and a twin circular culvert installation. The fill heights above the instrumented structures varied from 19 to 25 m. All the available data from both the field inspections and earth pressure measurements indicate that the culverts installed in induced trenches are performing in a satisfactory manner.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.