Abstract

The single machine scheduling problem with parameters given in the form of fuzzy numbers is considered. It is assumed that the optimal schedule in such a problem cannot be determined precisely (since the parameters of the problem are not known a priori). In this paper the concepts of possible and necessary optimality of a given schedule are introduced. The degrees of possible and necessary optimality measure the possibility and the necessity of the event that a given schedule will be optimal. In this paper, it is shown how to calculate the degrees of possible and necessary optimality of a given schedule in one of the special cases of the single machine scheduling problems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.