Abstract
Four nuclear power plant units have been operated in Finland over 20 years. The plants are located at two sites, Olkiluoto and Loviisa. Responsibility for nuclear waste management lies on the utilities, which have established a joint company POSIVA to take care of spent fuel disposal and other expert tasks of nuclear waste management.Already in 1983 the Finnish Government set the objectives and the schedule for the national waste management programme. Since then, two shallow underground repositories have been constructed for low- and medium-level operating waste in crystalline rock at the power plant sites. At the end of 2002 the amount of operating waste emplaced in these two facilities was 4923 m3 (total accumulation 6724 m3).Spent nuclear fuel is stored in interim storage pools at the nuclear power plant sites. The total accumulation was 1228 tU at the end of 2002. Today, the main activities in nuclear waste management concern spent fuel disposal deep in the Finnish bedrock. Apart from technical and scientific issues, a major challenge faced has been the creation of sufficient public acceptance, which is a must in order to obtain favourable political decisions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.