Abstract

According to the influence of the time sequence of urban distribution network construction by the difference of the growth trend of different industry load in urban distribution network, a planning method based on the industry load characteristics and the total supply capacity of distribution network is established. By studying the load growth characteristic of different industries, the model of industry load growth is established which is to analyze the load growth of the area in the next few years; Through the calculation of the total supply capacity of the existing distribution network, the total supply capacity can be extended is evaluated which determines whether a new substation need to be constructed or not. Through the analysis and comparison of the regional load growth over the next few years and the total supply capacity can be extended, the distribution network's construction scheme by stages can be made. Finally, a case demonstrates the effectiveness and economy of the method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call