Abstract

We consider the two-machine open shop and two-machine flow shop scheduling problems in which each machine has to be maintained exactly once during the planning period, and the duration of each of these intervals depends on its start time. The objective is to minimize the maximum completion time of all activities to be scheduled. We resolve complexity and approximability issues of these problems. The open shop problem is shown to be polynomially solvable for quite general functions defining the length of the maintenance intervals. By contrast, the flow shop problem is proved binary NP-hard and pseudopolynomially solvable by dynamic programming. We also present a fully polynomial approximation scheme and a fast 3/2-approximation algorithm.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call