Abstract

Abstract Traditional methods for prioritizing the renewal of water are based on heuristic models, such as the number of breaks per length, rule-of-thumb, and records held by the water utility companies. Efficient management of water distribution networks involves factoring in water and energy losses as the key criteria for planning pipe renewal. Prioritizing the replacement of a pipe according to the highest value of unit headloss due to ageing does not consider the impact on water and energy consumption for the whole network. Thus, this paper proposes a methodology to prioritize pipe replacement according to water and energy savings per monetary unit invested – economic prioritization. This renewal plan shows different results if comparing with replacing pipelines with regard to age and it requires calculating water and energy audits of the water distribution networks. Moreover, the required time to recover the investment performed needs to be calculated. The methodology proposed in this work is compared with the unit headloss criterion used in a real water-pressurized network. The results demonstrate that using the unit headloss criterion neither water, energy nor the investment is optimized. Significant water and energy savings are not fully exploited.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call