Abstract

Design and construction of pile foundation in seaside zone face the specific geotechnical conditions. The in-situ geotechnical tests need to be conducted. The quality feature of the piles is assessed according to the results of in-situ small strain test, coring test and pile stress test. For different depth of rock and soil stratum and pile bearing layer, the trial pile stress distribution results and follow-up stress and settlement monitoring provide engineering parameters for design and pile-driving.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call