Abstract
In this paper, we investigate the effect of parameter estimation from in-control Phase I samples on the in-control and out-of-control performance of the four Phase II control charts used for monitoring multivariate multiple linear profiles. These methods are evaluated in terms of out-of-control performance using corrected limits. The monitoring approaches investigated are then compared using the statistical properties of the ARL distribution. Furthermore, two optimization models are proposed for finding the optimum number of Phase I samples needed to achieve proper parameter estimations of desired accuracy and solved by using a novel hybrid simulation algorithm named HBSO.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Communications in Statistics - Simulation and Computation
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.