Abstract

Control charts are powerful tools used to monitor the quality of processes. In practice, control chart limits are often calculated using parameter estimates from an in-control Phase I reference sample. In Phase II of the monitoring scheme, statistics based on new samples are compared with the estimated control limits to monitor for departures from the in-control state. Many studies that evaluate control chart performance in Phase II rely on the assumption that the in-control parameters are known. Although the additional variability introduced into the monitoring scheme through parameter estimation is known to affect the chart performance, many studies do not consider the effect of estimation on the performance of the chart. This paper contains a review of the literature that explicitly considers the effect of parameter estimation on control chart properties. Some recommendations are made and future research ideas in this area are provided.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.