Abstract

This paper describes phase current reconstruction methods from dc-link currents in three-phase three-level PWM inverters. Since the three-level inverters have three paths between dc-link and power switches, the reconstructions differ from that in two-level inverters which have two paths there. Considering these paths in three-level inverter, this paper proposes the methods for phase current reconstruction. While the reconstruction method is executed by the currents sampled on the dc-links, the system encounters current-unmeasurable areas where the dc currents cannot be sampled due to the lack of measurement time according to the PWM status. This paper analyzes the areas and proposes a minimum voltage injection method for minimizing them to guarantee accurate current reconstruction. The method provides the expanded operating areas especially in low-output voltage operation and the minimized distortions in output voltages. The feasibility of the proposed method has been assessed in experiments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.