Abstract

PurposeIn Eritrea, a 6-month isoniazid preventive therapy (IPT) was introduced in Eritrea in 2014 to prevent/reduce risk of incident tuberculosis in people living with HIV (PLHIV). The global and local uptake of IPT in newly enrolled PLHIV was reported to be low. Anecdotal reports showed that there was resistance from clinicians against its implementation. This study was therefore conducted to explore the factors that affect implementation of IPT in Eritrea from the perspectives of healthcare professionals.Materials and MethodsAn exploratory qualitative study that used a framework content analysis using inductive approach was employed. Data were collected from a sample of HIV care clinic prescribers from regional and national referral hospitals through in-depth interviews. Senior program officers were also interviewed as key informants. A conceptual framework model was developed using a root cause analysis.ResultsOverall, five themes and 13 sub-themes emerged from the in-depth interviews with healthcare professionals and key informants. Several multi-level causes/factors related to the healthcare system, HIV control program, healthcare professionals, patients and the product were identified as barriers to the implementation of IPT. Information gap on IPT and fear of isoniazid-induced liver injury were identified as the main reasons for the reluctance in administering IPT. It was observed that healthcare professionals had significant information gap that resulted in rumors and doubts on the benefits and risks of IPT, which ultimately caused reluctance on its implementation. Inadequate planning and operationalization during the introduction of IPT and inadequate laboratory setups were found to be the possible root causes for the aforementioned central problems.ConclusionThe root causes/factors for the limited implementation of IPT in Eritrea were mainly related to the HIV control program and the healthcare system. Adequate planning, operationalization and capacitation of the existing laboratory setups are recommended for a successful implementation of IPT.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call