Abstract
A conduction-cooled cryogenic permanent magnet undulator, CU15, with a period length of 15 mm and 133 periods has been successfully developed. This undulator has been operated at the Taiwan Photon Source (TPS) storage ring at a beam current of 500 mA for more than 3 years. In CU15, two cryocoolers are used to cool the PrFeB magnets to 80 K. The effective magnetic field measures 1.33 Tesla for a magnet gap of 4.2 mm, maintaining an rms phase error below 2.6°. The bunch length of the electron beam in TPS is as short as 16 psec, leading to a serious issue with high beam-induced heating in CU15. This report addresses the above issues and provides detailed adaptations of CU15 to operate at a beam current of 500 mA. Published by the American Physical Society 2024
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.