Abstract
The rf system of China Spallation Neutron Source (CSNS) Rapid Cycling Synchrotron (RCS) utilizes vacuum tubes to drive the ferrite-loaded cavities. Ensuring stable tube operation in the rf system is crucial for the acceleration of high-intensity beams, as any instability may impede further increases in beam power. Therefore, the operation of the vacuum tube under heavy beam loading has attracted significant attention, particularly in the case of CSNS-II RCS, where the circulating beam current is expected to reach up to 15.25 A, imposing a substantial burden on the vacuum tube for beam loading compensation. Thus, a comprehensive analysis of tube operation is imperative. However, current methods for the tube operation analysis are developed based on wideband rf cavities, which are inadequate when the load of the tube is a narrowband ferrite-loaded cavity equipped with a tuning system. The presence of a tuning system renders the modeling method for wideband rf cavities inapplicable for ferrite-loaded cavities. Therefore, the development of a new method is necessary. This paper introduces a novel method for analyzing operation of vacuum tube driving a tuned cavity. The effectiveness of the method is validated by comparing the analysis results with measurements under beam loading conditions. Furthermore, an estimation of tube operation under 500 kW beam loading for CSNS-II is provided. Published by the American Physical Society 2024
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.