Abstract

Sidobandung Village is a village that will develop the potential of the village as a tourism village.The Solar Power Generation System is a power generation equipment. One of the potentials that has been successfully built is a reservoir or in local terms it is called a reservoir. With the construction of the reservoir in this village, tourism activities began to be seen. The number of visitors who came succeeded in increasing the village's income. Currently only open for daytime conditions. In its development, there is a desire to open services at night. The problem is how to reduce electricity costs. One of the facilities to support this is a floating building for the generation of floating PLTS which was built in collaboration with one of the expert vocational colleges in the field of floating buildings located in Surabaya. This Floating PLTS is a new renewable energy source, in accordance with the village's wish to become an educational tourism village. This floating PLTS is expected to be able to supply 30 lamps each having a power of 50 watts for street lighting around the reservoir. Another bean is colorful lights along the edge of the pond to give a beautiful impression of the view of the pond. The total lamp load is about 100 watts. The PLTS system that was built consists of 10 solar cell panels, each solar cell panel has a capacity of 330 WP. With a total of 4 batteries with specifications 12 Volt 200 Ah. This system is being evaluated. The evaluation results show that the battery capacity is only able to supply 15 lamps for 12 hours. So to supply all the desired load requirements, a total of 12 batteries are needed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call