Abstract
Group control charts are used for the statistical control of multiple stream processes. Recently, a modified control chart based on the residuals from each stream has been proposed as an alternative charting scheme. This research examines the performance of these charts under varying combinations of shift magnitudes and number of streams affected. Several simulated scenarios were generated and used to evaluate the long-term performance of the two schemes in terms of the average run length. Statistical analysis of the results indicated that the modified chart has an advantage over the traditional group chart in terms of the rate of false alarms. However, both charting schemes appear to have similar shift detection capabilities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.