Abstract

Central Java Province intends to improve the use of renewable energy (EBT) such as water resources. Logung river at Ngaliyan subdistrict, Temanggung district has potential energy for micro power plan. The first step to use the water resource is determining the capacity of a mini hydro power plan in accordance with the conditions of the river Logung. Based on the the technical study, the elvation height between the prospective weir with potential power house is 110 m and the effetive height at 105 m. Logung maximum river flow is 11.06 m3/dt, with average flow is 4,77 m3/dt., The minimum flow is 0,75 m3/dt. This electricity power is 10253.12 KW with maximum flow, it will be produced 4848.44 KW at maximum flow 60 %. The minimum flow can deliver 695,28 KW. The suitable capacity for the generator of micro power plants of Logung is 3220 KVA when it is according to manufacture. Key words : power, flow, power

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.