Abstract

PEP-II is a two-ring asymmetric B factory operating at the ϒ(4S) resonance. It was constructed by a SLAC-LBNL-LLNL collaboration. The collider comprises two rings, a High-Energy Ring (HER) storing 9 GeV electrons, and a Low-Energy Ring (LER) storing 3.1 GeV positrons. Commissioning of the HER began in mid-1997 and commissioning of the LER began in mid-1998. First evidence for collisions was obtained on July 23, 1998. The B AB AR detector was installed in early 1999, and commissioning with the detector commenced in May 1999. In the present run, which began in October 1999, the peak luminosity has reached 3.1×10 33 cm −2 s −1 and the integrated luminosity delivered is 25 fb −1 . In this paper we describe the startup experience and summarize the operational experience during fiscal year 2000 (from October 1999 through September 2000). Plans for luminosity upgrades are briefly described.