Abstract
The vacuum systems of the storage rings of the PEP-II B-Factory have had by now over two years of production running at high beam current and seen synchrotron radiation from almost 4 kAh High Energy Ring (HER) and 10 kAh Low Energy Ring (LER) of integrated beam current. The systems have performed well, reaching the design pressures and being able to cope with beam currents of almost 1 A HER and in excess of 2 A LER. The photo-desorption coefficient {eta} was found in the HER to have reached values as low as 10{sup -7}. The shielded bellows have performed very well, with only one pair of bellows assemblies damaged due to higher-order mode generation from a known, nearby source. Issues encountered during normal operation have been a significant amount of dust trapping in the HER and the effect of a cloud of photo-electrons around the positron beam affecting the LER beam size. A couple of chambers in the HER failed; these failures arose from a combination of design and fabrications issues. The beam life time in the LER has been lower than expected based on the vacuum pressure and has been determined to be Touschek limited.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.