Abstract
Nickel is the fifth most common chemical element on Earth. Several regions in Indonesia with large nickel content are East Luwu, South Sulawesi, Kolaka, Southeast Sulawesi, Morowali, Central Sulawesi, East Halmahera, North Maluku. Most nickel mines use a mining method with an open mining system (Surface Mining) using a method (Open Cut Mining), namely cutting from the ridge downwards. The mining stages are carried out by clearing land, stripping overburden, dredging ore, loading and hauling for purification and processing. CV. Sentosa Abadi is a Mining Contractor based in Palu City, Central Sulawesi and also has a site camp in Bahomakmur Village, Bahodopi District. The company uses an open cut process along with open-pit mining technology. Land clearing, removal of top soil and cover soil. The aim of this research is to determine the overburden production target in July at CV. Sentosa Abadi and to evaluate production increases which are influenced by waiting times. Calculating production targets is one way to plan and control production, apart from that, production targets can also be defined as a tool to carry out effective and efficient planning. From research This is the volume of overburden produced during one month with total production of 296,927.7 bcm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.