Abstract

The construction of cantilever retaining wall uses reinforcement as part of the retaining wall’ structure. Reinforcement of the construction of the Retaining Wall is carried out on construction if there is a need for additional reinforcement on the structure or carrying out reconstruction on the structure of the retaining wall. Research on the use of starter rebar uses chemical epoxy, which is used to reconstruct the retaining walls. Soil investigation is carried out because the soil in this structure acts as a load, then this soil parameter is calculated as a lateral force on the wall that makes the rolling moment, and sliding. The land load also acts as a counter weight behind the wall. The study of the use of back reinforcement on the structure of cantilever type retaining wall uses D19-170 as the main reinforcement in the tensile area and D16-170 in the compressed area. Reinforcement for used D13-170.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call