Abstract

Bogor City has a high level of rainfall and is included in an area with a high potential for landslides. In March 2021, there was a landslide in a densely populated residential area at RT. 02/03 Cipaku Village, Bogor Selatan District. The landslide occurred on the slopes at the tributary of Cisadane River and adjacent to the nearest connecting bridge. The length of the landslide is 6 meters and as high as 7 meters from the water surface. Mitigation steps to prevent subsequent landslides are needed by constructing a retaining wall, so a cantilever-type retaining wall is chosen by considering the soil parameters and landslide conditions. The results of the analysis show that the stability of the retaining wall against shear (Fs) = 1.04 < SF = 1.5 and for stability against overturning (Fo) = 0.56 < SF = 1.5. Thus, the overall retaining wall is not able to withstand the load of the soil behind it. In terms of stability to the bearing capacity of the soil, the ultimate soil capacity (qs) = 94.149 kN/m2 > V = 243.535 kN/m2. Thus, the subgrade can withstand the load of the retaining wall. Therefore, to meet shear stability and overturning stability, the retaining wall is reinforced by using a bored pile foundation. The results of the foundation analysis showed that the allowable capacity (Qs) was obtained at 584.8 kN.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.