Abstract
Two major generalizations of the Precedence Diagramming Method (PDM) and an algorithm solving the generalized network are discussed in this paper: a) Two new types of precedence relations are introduced: minimal point-to-point and minimal continuous relations; b) Non-linear production-time functions can be defined in order to better adapting the model for real life situations. The activity progress-in-time function can be any strictly increasing continuously derivable function. The mathematical model, and the algorithm is shortly described, then the calculations are shown in details through an artificial example project. The emphasis is on the calculations, as this example project will be used in other papers on generalized PDM models.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.