Abstract

This paper introduces the parallel machine scheduling problems with work related musculoskeletal disorder (WMSD) risk considerations. By the WMSD consideration, we mean that job processing times are an increasing function of occupational repetitive technical actions (OCRA) risk factor. The OCRA index was recruited for risk assessment of occupational repetitive technical actions. WMSD risks were modeled with cumulative mean value of OCRA index. Due to NP-Hard structure of parallel machine scheduling problems with WMSD considerations and learning rate, the solution cannot be found always. However, problem can be solved by transforming assignment problem. In spite of the fact that the computational effort remains O (n 4 ), problem is solved within more efficient time. In this study, a model that includes learning effect and WMSD risk was proposed. WMSD risk was considered as cumulative mean of risk value throughout shift. In order to the balance between productivity and WMSD risk, jobs’ foreseeable cycle time (FCT) value was changed. It is aimed to decrease mean of risk along schedule without increasing total basic process time. The value of sacrifice from the FCT was compensating from job which have optimal, acceptable, borderline or slight risk level. Process time and risk values were recalculated by using new FCT value. Thus, balanced process times and risk values obtained. Proposed model was solved with Lingo software and sequence of jobs was obtained. Total flow time and mean of risk were compared for balanced and none balanced schedules. Total flow time and mean of risk belong to balanced schedule is smaller than none balanced schedule. It was shown that handled problem is solvable at the polynomial time and total flow time can be improved by bringing balance between WMSD risks and productivity.

Highlights

  • The risk assessment in a manufacturing line is done as legal obligation nowadays

  • We proposed that schedules performance can be improve by balancing productivity and work related musculoskeletal disorders (WMSD) risk

  • It was shown that handled problem is solvable at the polynomial time and total flow time can be improved by bringing balance between WMSD risks and productivity

Read more

Summary

Introduction

The risk assessment in a manufacturing line is done as legal obligation nowadays. It is performing within the scope of occupational health safety. Precautions should be considered towards protection of employees or workplace from possible risks. Risk assessments are used by machine manufacturers and designers for safety in machines and evaluation of human physical performance. The effect of risk exposed in manufacturing line towards scheduling, processing time and due-dates has not been enlightened yet. In this study it is accepted that, the risks have effects on scheduling, processing time and due-dates, are WMSD risks

Methods
Results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.